Procedures For Nb-Series Pts' Operation; Sec - Omron NB Series Operation Manual

Nb-series programmable terminals
Hide thumbs Also See for NB Series:
Table of Contents

Advertisement

1 Introduction
1-4
Procedures for NB-Series PTs'
Operation
Perform the following procedures to operate the NB-Series PTs.
Host
Host setting
• Host link
See
2-4 Communication Connections
in the
NB Series Setup Manual
• Connect to other company's PLC
See NB Series Host Connection Manual
PT connections
Programming
*1 The system will enter RUN mode after the screen data is input.
*2 System program is installed only under special circumstances, such as when the system program is
transformed or repaired.
*3 The system program mode can be entered by using the DIP SW on the back side.
*4 When the abnormalities occur during the operation, the operations such as checking input/output and
confirming the setting state etc can be performed as required.
1-8
PT
Panel installation
See
2-1-2 Installation on to the Operation panel
in the
Peripheral connections
Power connections
See
2-1-3 Connecting the Power Supply
in the
Power ON *1
System program
installation *2
See
Section4 Functions of NB Manager
System program
mode *3
See
Section3 System Setting Mode
in the
NB Series Setup Manual
Host connections
Settings/com check
Operation
System
maintenance *4
NB-series Programmable Terminals NB-Designer Operation Manual(V106)
NB-Designer
Installation on the
NB Series Setup Manual
Screen creation
NB Series Setup Manual
Screen transfer
See
3-15 Download
computer
See Section2 Installation and
Startup of NB-Designer
See Section3 Functions of
NB-Designer

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents