Novell ZENWORKS LINUX MANAGEMENT 7.2 IR2 - ADMINISTRATION GUIDE 09-25-2008 Administration Manual page 227

Table of Contents

Advertisement

As part of the process of distributing a bundle, ZENworks Linux Management can launch
scriptable actions that will be executed before and after the bundle is distributed, installed, and
uninstalled. For example, you can get data files from a Web server before installing an
application that uses them, run applications, and so forth.
NOTE: You can configure multiple scripts for each bundle. Repeat the configuration process
as many times as desired, choosing different options from the Scriptable Action and Executable
Type drop-down lists, explained below.
8 Click New to display the New Scriptable Action dialog box.
9 Fill in the fields:
9a Scriptable Action: Select one of the following actions:
Pre-distribution/post-distribution: Lets you perform tasks that must be done
before or after a bundle is deployed to assigned devices. Deploying a bundle means
that the packages or files inside the bundle are downloaded from the ZENworks
server to the assigned devices. The packages and files are not yet available for use.
Pre-installation/post-installation: Lets you perform tasks that must be done before
or after a bundle is installed. Installing a bundle means that the software packages
and files are installed to assigned devices and available for use.
Pre-uninstallation/post-installation: Lets you perform tasks that must be done
before a bundle is uninstalled. Uninstalling a bundle means that the software
packages and files are uninstalled on assigned devices and no longer available for
use.
Using RPM and File Bundles 227

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenworks linux management 7.2ir2

Table of Contents