6.
CPU board [A] (LCD I/F cable ×1)
•
After replacing the CPU board, make sure that the latest version of the firmware is installed on the
Smart Operation Panel. Update it if necessary.
Micro Computer Board
1.
Operation panel unit
2.
CPU board
(CPU
3.
Remove the FFC from the micro computer board (
•
Pull out the black part to unlock the connector, and then remove the FFC.
(Operation Panel
Unit)
Board)
1.Replacement and Adjustment
(Updating the Smart Operation
×1).
Panel)
7