JRC JMR-92 Series Field Service Manual page 529

Marine radar equipment, ecdis conning display
Table of Contents

Advertisement

Step 3
Operation check
After having completed the replacement, turn On the safety switch and check operation by
following the procedure below.
(1) Turn On the Display unit. After the countdown is completed, start transmission and check
that the radar image appears without error. Transmit the radar wave in the long range
mode and open the service engineer menu to perform tuning adjustment. With the
service engineer menu open, also make sure the magnetron current is shown between
the 8th and 10th calibration markings.
This completes receiving unit replacement.
4-309
Chapter 4 Replacement procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents