JRC JMR-92 Series Field Service Manual page 583

Marine radar equipment, ecdis conning display
Table of Contents

Advertisement

14-3. Initial setup for RADAR. (RADAR Licence)
Set up the RADAR by reffering the followings:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14-4. Re-install electronic charts. (ECDIS Licence)
Re-install the electronic charts for ECDIS by referring the followings:
-
-
-
-
14-5. Reconfigure the CONNING Display. (CONNING Licence)
Set up the Conning Display by referring the followings:
-
-
Chapter 4 Replacement procedure
Installation information at the time of commissioning, which is described in
the installation check list
Installation Manual 4.10 Setting Data Output
Installation Manual 4.16 Setting Interswitch
Installation Manual 4.21 Tune Adjustment
Installation Manual 4.22 Bearing Adjustment
Installation Manual 4.23 Range Adjustment
Installation Manual 4.24 Master/Slave Radar Operation Mode
Installation Manual 4.25 Setting an Antenna Height
Installation Manual 4.26 Tune Peak Adjustment
Installation Manual 4.27 Setting a Tune Indicator (tuning indicator level)
Installation Manual 4.28 Setting Output BP (Radar Antenna Bearing Pulse
Output)
Installation Manual 4.29 Performance Monitor Adjustment
Installation Manual 4.30 Setting Sector Blank (RADAR Screen Only)
Installation Manual 4.31 Setting TNI Blank
Installation Manual 4.32 Setting Input BP Count
Installation Manual 4.33 Setting Output BP Count
Installation Manual 4.34 Echo Noise Level Adjustment
Installation Manual 4.35 TT (Target Tracking) Function Adjustment (RADAR
Screen Only)
Installation Manual 4.36 Adjusting MBS
Installation Manual 4.39 RADAR Adjustment (RADAR Screen Only)
Installation information at the time of commissioning, which is described in
the installation check list
Additional Manual for Chart Installation 2.1 Importing ENC S-57/S-63
Charts, AVCS Charts and AIO Data
Additional Manual for Chart Installation 3.2 Importing ARCS Charts
Additional Manual for Chart Installation 4.3 Importing C-MAP Ed.3
Installation information at the time of commissioning, which is described in
the installation check list
Conning Display Instruction Manual
4-362

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents