Nortel Meridian Companion Installation And Maintenance Manual page 75

Nortel meridian companion: installation guide
Hide thumbs Also See for Meridian Companion:
Table of Contents

Advertisement

P0725810 Issue 3.0
Note: The polarity of the TCM connections is not important. If
two power pairs are brought in, they must be connected
with the same polarity to the Base Station bracket
termination board.
!
Ensure that the RPI is OFF before connecting power
pairs to the Base Station.
Figure 34: Bracket termination board
RJ11 jack
5. Hang the Base Station onto the bracket, snapping it into position.
6. Connect the power RJ11 jumper lead to the RJ11 jacks on the
termination board and the Base Station.
7. Record the associated Controller port number in the space
provided on the printed label affixed on the lower right corner of
the mounting bracket.
Note: Include the labeling information for each Base Station on
the completed installation floor plans and the
COMPANION 200 Programming Record for later
reference.
8. Slide the cover onto the bracket, using the guide to position it
properly. Snap it into place.
COMPANION 200 Installation and Maintenance Guide
Installing the hardware 76
TCM
TCM
-PWR(1)
+PWR(1)
-PWR(2)
+PWR(2)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Companion 200

Table of Contents