171 Appendix E: Installing Base Station plug-top power supplies
Mounting a Base Station
COMPANION 200 Installation and Maintenance Guide
Note: When mounting several Base Stations in a cell, the cell size
is determined by the area common to all the Base Stations for
that cell.
Position the Base Station within 4 m of an ac outlet, since the plug-
top power supply has a 4-meter cord. Keep these points in mind:
• The power supply must be located in an area accessible to a
properly grounded ac outlet.
• The input plug is part of the power supply. The only way to
remove power is to disconnect the power supply.
• If you must install a new ac outlet to accommodate the power
supply, ensure that the ac outlet is mounted with sufficient
clearance to plug the power supply.
• If more than one Base Station is installed at a cell center, ensure
that each plug-top power supply has a separate ac outlet.
Base Stations can be mounted on a wall or on a ceiling (when
mounting on a wall, install it with the cover at the bottom, as shown
in the illustrations). Allow for the following clearance around the
Base Station:
Figure 41: Clearance for the Base Station
30 cm
30 cm
30 cm
Base Station
To mount a Base Station, follow these steps:
1. Fasten the bracket into position using two screws.
2. Route the power supply cord through the bottom (or top)
opening and under the strain relief of the bracket.
3. Route the cable from the Controller through the top (or bottom)
opening.
Base Station
39 cm
30 cm
Cover
37 cm
39 cm
30 cm
Bracket
P0725810 Issue 3.0