Reassembling The Projector With Kit Parts; Step By Step Actions; Reassembling Steps; Adaptation Of The Safety Cable Tightening Unit - Barco SLM R12 Plus Service Manual

Table of Contents

Advertisement

28. Upgrade with Air Filters
B
Image 28-13
Removal of the bottom cover
2. Remove the 4 screws (B), securing the bottom cover to projector base.
3. Remove the bottom cover.

28.3 Reassembling the projector with kit parts

28.3.1 Step by step actions

Replacement of the bottom and rear cover provided with air filters
1. Mount the bottom cover provided with air filters.
2. Mount the new spring fixation plate for the safety cable (side input assembly).
3. Mount the 3 carrying handle fixation studs, inserting a plain washer.
4. Mount the carrying handle.
5. Mount the 2 removed stacking points
6. Successively, mount back top, rear and lamp cover and last one the input assembly.

28.3.2 Reassembling Steps

28.3.2.1 Adaptation of the Safety cable tightening unit

Necessary tools
Allen key of 6 mm and 2.5 mm.
How to adapt
When attempting to reinstall the carrying handle, the safety cable tightening unit (side air channel) will collide with the added air
channel on the new bottom cover. For that reason, the safety cable tightening unit on the carrying handle has to be adapted.
1. Disassemble the safety cable tightening unit as follows:
-
Remove the 2 screws (A) holding spring support (B) to U-bracket (C).
-
Remove the bolt (D) securing the safety cable tightening assembly.
Note: only the wheel of the assembly will be reused.
264
A
R5976820 SLM R12+ PERFORMER 08/03/2005

Advertisement

Table of Contents
loading

Table of Contents