Step 3: Installing Your Library In A Rack; Verifying Rack Mount Kit Contents - IBM System Storage TS3310 Setup And Operator Manual

Tape library
Hide thumbs Also See for System Storage TS3310:
Table of Contents

Advertisement

4. Turn the switch on all power supplies in your library to the ON ( | ) position.
5. On the front panel of the library, push the power button. If the library is
6. Copy the following information from the small label in the bottom left corner
7. When the Operator Panel displays the Setup Wizard: Welcome screen, push
8. Turn the switch on all power supplies in your library to the OFF ( O ) position.
9. Unplug all library power cords from your power source, then unplug the other
Now, you can proceed with the installation of your library.

Step 3: Installing Your Library in a Rack

If you are not installing your library in a rack, proceed to "Step 4: Cabling the
Library" on page 3-16.
The following sections give instructions on installing your library in a rack.
v "Verifying Rack Mount Kit Contents"
v "Identifying the Location in the Rack" on page 3-6
v "Installing the Rails" on page 3-8
v "Reducing Library Weight" on page 3-11
v "Placing the Library in the Rack" on page 3-12
v "Installing the Rack Ears" on page 3-13
v "Installing Library Components Removed for Weight Reduction" on page 3-14

Verifying Rack Mount Kit Contents

The Rack Mount Kit will include rails and hardware to install a 5U library (control
module). An Additional Rack Hardware Kit with the necessary parts to install a
14U library (5U control module + 9U expansion module) will be included in your
shipment but not in the Rack Mount Kit.
3-4
TS3310 Tape Library Setup and Operator Guide
functioning properly, the Operator Panel will turn ON and the library will run
its Power On Self Test. If the library is not functioning properly, see
"Contacting IBM Technical Support" on page 9-15.
of the front panel of each library module on the Appendix D, "Library
Configuration Form," on page D-1:
v Type (machine type - model)
v S/N (module serial number)
the power button to power down the library.
Important: DO NOT TOUCH THE OPERATOR PANEL AT THIS TIME TO
ENSURE A SUCCESSFUL LAUNCH OF THE SETUP WIZARD.
end of each power cord from each power supply installed in the library.

Advertisement

Table of Contents
loading

Table of Contents