BRP EVINRUDE E-TEC 115 HP 2011 Service Manual page 216

Table of Contents

Advertisement

POWERHEAD
POWERHEAD ASSEMBLY
Apply a light coat of outboard lubricant to the cor-
ners of the connecting rod and rod cap. Place
frame on connecting rod using the following pro-
cedure:
Position frame onto the connecting rod so the
contact area of the jaw is centered on the side
of the rod.
Tighten forcing screw until jaws contact con-
necting rod.
Slide frame down until adjustment stop contacts
the rod cap. The groove lines on the jaws must
be centered on the rod/crankpin diameter.
Tighten the forcing screw to a torque of 14 to 16
in. lbs. (1.6 to 1.8 N·m).
2
1. Forcing screw
2. Adjustment stop
3. Groove line
IMPORTANT:
Make sure that frame is squarely
in position and that rod and cap are aligned.
Loosen both rod cap screws one-quarter turn.
214
Use Torquing Socket, P/N 331638, to tighten rod
cap screws in three stages:
Apply first torque of 40 to 60 in. lbs. (5 to 7 N·m)
to both rod cap screws.
Tighten screws to a torque of 14 to 16 ft. lbs. (19
to 21.7 N·m).
Apply final torque of 30 to 32 ft. lbs. (41 to 43
N·m).
1
IMPORTANT:
3
installed as above. Then, it must be removed, re-
lubricated, and installed again.
Loosen forcing screw and remove the frame.
005297
Test at least three corners of the rod and cap joint
with a pick. Joint must be smooth with no step.
If a new screw is used, it must be
005299
005300

Advertisement

Table of Contents
loading

Table of Contents