Nortel DMS-100 Series Maintenance Manual page 200

Subscriber carrier module-100s
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

6-36 Alarm clearing procedures
PM SMS
minor
(continued)
48
49
50
297-8231-550 Standard 09.01 August 1998
The system determines the type of SWACT (warm or cold) the system can
perform. The system displays a confirmation prompt for the selected SWACT.
If SWACT
cannot continue at this time
can continue at this time
Do not switch activity of the units. To reject the switch, type
>NO
and press the Enter key.
The system does not continue the switch of activity. Return to step 47 during a
period of low traffic.
To switch the activity of the unit, type
>YES
and press the Enter key.
The system runs a pre-SWACT audit to determine if the inactive unit can accept
activity correctly.
Note: A maintenance flag (Mtce in the following example) appears when
maintenance tasks are in progress. Wait until the flag disappears before you
proceed with the next maintenance action.
If the message is
SwAct passed
SwAct failed
SwAct failed
Reason: XPM SwActback
Reason: XPM SwActback
SwAct refused by SwAct
controller
To force a switch of activity to the active unit, type
>SWACT FORCE
and press the Enter key.
When the SWACT is complete, the short term history reasons that the SWACT
controller uses to refuse the SWACT,are reset.
Do
step 48
step 49
Do
step 51
step 45
step 50
step 50

Advertisement

Table of Contents
loading

Table of Contents