Table 9: Site Preparation Checklist (continued)
Item or Task
Verify that your rack meets the minimum
requirements for the installation of the router.
Plan rack location, including required space
clearances.
If a rack is used, secure rack to floor and building
structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation

M10i Rack Requirements

40
All manuals and user guides at all-guides.com
For More Information
"Installation Safety Warnings for M
Series, MX Series, and T Series
Routers" on page 152
"Clearance Requirements for Airflow
and Hardware Maintenance" on
page 43
"M10i Rack Size and Strength" on
page 41
"Connection to Building Structure" on
page 43
"Calculating Power Budget for
Fiber-Optic Cable for M Series, MX
Series, and T Series Routers" on
page 197
"Calculating Power Margin for
Fiber-Optic Cable for M Series, MX
Series, and T Series Routers" on
page 198
"Maintaining the M10i PICs and PIC
Cables" on page 81
M10i Router Description on page 3
M10i Router Physical Specifications on page 183
M10i Router Power Requirements on page 188
The router must be installed in a rack. Many types of racks are acceptable, including
4-post (telco) racks and open-frame racks. An example of a open-frame rack appears
in Figure 19 on page 42.
The following sections describe rack requirements:
M10i Rack Size and Strength on page 41
Spacing of Mounting Holes on page 42
Connection to Building Structure on page 43