Leave at least 6 in. (155 mm) above the mounting bracket and any
obstruction (such as a pipe or conduit) so that there is room to lift the
cabinet on and off the bracket.
Leave at least 12 in. (305 mm) between the top of a cabinet and the
ceiling to ensure proper ventilation.
Leave at least 10 in. (255 mm) between the bottom of the cabinet and the
floor to prevent water damage and to allow for ventilation.
If the NTAK92 Off-premises protection module is used, allow for proper
installation (according to local practices)
Ensure power outlets are within reach of each cabinet. Cable and wire
specifications are shown in
page

Equipment layout plan for wall mounting

Figure 6
shows a typical wall layout using BIX cross-connection equipment.
Use of other types of terminal blocks and equipment will alter the layout.
Option 11C Compact
Chapter 3 — System and site requirements
16.
Planning, Installation, Fault Clearing and CCBR Guide
Table 2, "Cable and wire specifications," on
Page 39 of 536