Nortel Meridian 1 Planning, Installation And Operating Instructions page 88

Hide thumbs Also See for Meridian 1:
Table of Contents

Advertisement

Chapter 6 – Bracing cabinets against earthquakes
Page 69 of 536
4
Proceed with the system installation
Once the backboard is securely fastened to the wall, proceed with the
equipment installation procedures as described in
"Chapter 7– Preparing for installation" on page
71.
—————————— End of Procedure ——————————
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Option 11c compact

Table of Contents