Xerox 2510 Service Manual page 290

50/60 hz copier
Table of Contents

Advertisement

1
8.
Place t w o (2) sheets of clean 20 pound (80
NOTE: STEP 1 I 8: The electrometer, meter
7.
Insert four
(4)
sheets of 20 pound (80
gsm) paper on the entire surface of the
and the leads must be positioned away
gsm) paper between the electrometer
platen before installing the document
from the HVPS in order to obtain
probe holder and the photoreceptor
handler.
correct voltage measurement. The
drum.
meter and electrometer must also be
9. Install the document handler.
separated as
shown
In Figure
3,
Position the electrometer, meter and
NOTE: This establishes the correct distance
10.
( F i g u r e
3):
the electrometer,
meter
the leads this way for the remainder of
between the electrometer probe
and
and the test leads.
the procedure. Do not connect the
the photoreceptor drum,
meter and electrometer at this time.
The purpose of this illustration is to
show the prope position. Attach the
components as needed in subsequent
ITION THE ELECTROMETER
BE
IN THE MIDDLE OF THE
steps.
TORECEPTOR DRUM
1 1 . Install the power cord into the receptacle.
B
ENSURE THAT THE
ELECTROMETER, THE METER AND
THE LEADS ARE POSITIONED
AWAY FROM THE HVPS
INSTALL UPPER REAR
COVER AND
/
DOCUMENT HANDLER
C
INSTALL TOOL
600T91616
INSTALL A DRUM SHIELD OVER THE
COPIER TO BLOCK STRAY LIGHT
Figure 2. Install the Electrometerprobe
Figure
3.
The Correct Position of the Electrometer, Meter.and the Leads
ADJ 9.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2515

Table of Contents