Cranking System Test - Suzuki Liana RH413 Service Manual

Table of Contents

Advertisement

1I-3 Starting System:

Cranking System Test

CAUTION
!
Each test must be performed within 3 – 5
seconds to avoid coil from burning.
Pull-In Test
Connect battery to the magnetic switch as shown.
Check that plunger and pinion move outward.
If plunger and pinion don't move, replace the magnetic
switch.
NOTE
Before testing, disconnect lead wire from
terminal "M" (2).
1. Terminal "S"
3. Lead wire (switch to motor)
Hold-In Test
While connected as the figure with plunger out,
disconnect negative lead from terminal "M".
Check that plunger and pinion remain out.
If plunger and pinion return inward, replace the magnetic
switch.
Plunger and Pinion Return Test
S3RH0A1904002
Disconnect negative lead from starting motor body.
Check that plunger and pinion return inward.
If plunger and pinion don't return, replace the magnetic
switch.
No-Load Performance Test
Connect battery and ammeter to starter as shown.
Check that starter rotates smoothly and steadily with
pinion moving out. Check that ammeter indicates
specified current.
Specified current (No-load performance test)
90 A MAX. at 11 V
I2RH01190002-01
I2RH01190003-01
I2RH01190004-01
I2RH01190005-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liana rh416

Table of Contents