1D-17 Engine Mechanical:

Timing Chain Cover Components

[A]: Sealant application amount
"a": 3 mm (0.12 in.)
"b": 2 mm (0.08 in.)
1. Crankshaft pulley bolt
"A": Apply sealant 99000-31140 to the mating surface of cylinder and cylinder head.
"B": Apply sealant 99000-31250 to the mating surface of timing chain cover referring to the figure of Step 1) in "Installation" of "Timing Chain Cover
Removal and Installation".

Timing Chain Cover Removal and Installation

Removal
1) Remove engine assembly from vehicle referring to
"Engine Assembly Removal and Installation".
2) Remove crankshaft pulley bolt.
To lock crankshaft pulley (1), use special tool with it
as shown in the figure.
Special tool
(A): 09917–68221
2. Crankshaft pulley
3. Oil seal
: Apply engine oil to oil seal lip.
4. Timing chain cover
: See "A"
: See "B"
5. Pin
S3RH0A1406020
3) Remove crankshaft pulley (1).
If it is hard to remove, use special tools as shown in
the figure.
Special tool
(A): 09944–36011
(B): 09926–58010
S3RH0A1406019
I3RH0A140005-01
6. Timing chain cover mounting bolts
: Tightening torque
: Do not reuse.
I2RH0B140051-01