Completing the Installation

3-5-1

Power On/Boot Up

NOTE:
After turning off the system, wait at least ten seconds before turning it on again. The system
may not be able to boot if power is recycled too quickly.
3-5-1-1
Scanner Power On
1.) Connect the Main Power Cable at the rear of the System.
Protective earth must be taken when connecting AC power cable (200V) without its plug
WARNING
WARNING
to wall outlet.
2.) Connect the Main Power cable to an appropriate mains power outlet.
3.) Switch ON the Main Circuit Breaker at the rear of the System.
When power is applied to the Scanner, and the Rear Circuit breaker is turned ON, Power is distributed
to the ATX smps in the Back End Processor and Power control circuit in the AC power assy . When the
Power ON/OFF key is pressed once, the power control circuit turn on the card cage and fans, and Back
End Processor ,Monitor. Backend Processor starts and its software code is distributed to initiate the
scanner.
4.) Press the ON/OFF key at the keyboard paenl of the System once.
7
Figure 3-13 Circuit Breaker
Chapter 3 Installation
Main Circuit Breaker
Main Power Cable
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
3 - 11