Installation Reminders; Average Installation Time; Installation Warnings - GE LOGIQ 5 PRO Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2380207, R
IRECTION
EVISION
Section 3-2

Installation Reminders

3-2-1

Average Installation Time

Table 3-2
Unpacking the scanner
Scanner wo/options
DICOM Option
InSite Option
The LOGIQ™ 5 PRO has been designed to be installed and checked out by an experienced service
technician in approximately four hours. LOGIQ™ 5 PRO consoles with optional equipment may take
slightly longer.
3-2-2

Installation Warnings

1.) Since the LOGIQ™ 5 PRO weighs approximately 180 kg. (397 lb.) without options, preferably two
people should unpack it. Two people are also preferable for installing any additional bulky items.
2.) There are no operator serviceable components. To prevent shock, do not remove any covers or
panels. Should problems or malfunctions occur, unplug the power cord. Only qualified service
personnel should carry out servicing and troubleshooting.
NOTE:
For information regarding packing labels, refer to LABELS ON PACKAGE.
3.) After being transported, the unit may be very cold or hot. If this is the case, allow the unit to
acclimate before you turn it on. It requires one hour for each 2.5°C increment if its temperature is
below 10°C or above 40°C.
Equipment damage possibility. Turning the system on without acclimation after arriving at site
CAUTION
may cause the system to be damaged.
Table 3-3
°C
60
°F
140 131 122 113 104
hrs
8
3 - 2
7
Average Installation Time
Description
Average Installation Time
Acclimation Time
55
50
45
40
35
96
6
4
2
0
0
Section 3-2 - Installation Reminders
0.5 hour
0.5 hour
0.5 hour
0.5 hour
30
25
20
15
10
5
86
77
68
59
50
41
0
0
0
0
0
2
LOGIQ™ 5 PRO S
Comments
Dependant on the configuration that is required
Dependant on the amount of configuration
0
-5
-10
-15
-20
-25
32
23
14
5
-4
-13
4
6
8
10
12
M
ERVICE
ANUAL
-30
-35
-40
-22
-31
-40
14
16
18
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents