Fuse Set (Fru No. 705); Manpower; Tools; Preparations - GE LOGIQ 5 PRO Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2380207, R
IRECTION
EVISION
8-9-6

Fuse Set (FRU No. 705)

Purpose: This is a description on how to remove and replace the Fuse Set.
8-9-6-1

Tools

Common pillips screwdrivers
Allen/Unbraco wrench
8-9-6-2
Needed Manpower
1 person, 15 minutes + travel
8-9-6-3

Preparations

Shut Down the System and switch off the Main Breaker at the rear as described in section 4-3-2 on
page 4.
8-9-6-4
Removal Procedure
Do not wear the ESD wrist strap when you remove a part of power supply unit. Turn OFF power
CAUTION
and unplug the power cord before removing a part of power supply unit. However be sure to turn
off power and wear the strap before you remove a circuit boards.
NOTE:
Fuses can be removed without disassembling AC Power Assy.
1.) Unscrew four (4) screws (1-4) to remove Left side cover of AC Power assy.
2.) Remove the Fuses. Refer to Figure 8-185.
220V/3A
110V/5A
10A
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-54
Service Manual
Section 4-3-1
Section 4-3-2
Section 4-9-20
Section 4-3-4
Section 4-3-5
8-9-6-5
Mounting Procedure
Install the new parts in the reverse order of removal.
7
Figure 8-185 Removing the Fuse
Functional Tests
Section
Functional Test / Diagnostic Test
Fuse set function check procedure
System B/M-Mode Checks
System CFM and PWD Checks
Chapter 8 Replacement Procedures
Power On/Boot Up
Power Off / Shutdown
LOGIQ™ 5 PRO S
ERVICE
3A
Debrief Script
"Service Manual, Direction
2380207
, Rev 7+, Section 8-9-6. Equipment
passed all required tests and is ready for use. "
M
ANUAL
8 - 165

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents