Preliminary Checks - GE LOGIQ 5 PRO Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2380207, R
IRECTION
EVISION
Section 10-5
System Maintenance
10-5-1

Preliminary Checks

The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-4
Step
1
2
3
4
5
6
7
System Checks
Item
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
Fill in the top of the Ultrasound Inspection Certificate (see page 23). Note all probes and system
Paperwork
options.
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
Power up
power up to verify that no warning or error messages are displayed.
Probes
Verify that the system properly recognizes all probes.
Displays
Verify proper display on the monitor and touch panel.
Presets
Backup all customer presets on an CD-RW.
Chapter 10 Care & Maintenance
LOGIQ™5 PRO S
Description
M
ERVICE
ANUAL
10-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents