Concluding Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

System board and components
Figure 128: Removing the UFM board (B)
Ê The UFM spacer remains on the system board (1).
9.2.2.4

Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 64
Ê
220
Upgrade and Maintenance Manual
CX250 S2

Advertisement

Table of Contents
loading

Table of Contents