6.4.4.3
Installing the 10 GbT mezzanine card
Figure 56: Installing the 10 GbT mezzanine card
Ê Insert the connector of the 10 GbT mezzanine card in the linking board.
Ê Secure the mezzanine card bracket with three screws (see circles).
6.4.4.4
Concluding steps
Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê Reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Enabling boot watchdog functionality" on page 74
Ê
"After replacing / upgrading LAN controllers" on page 82
Ê
CX250 S2
Expansion cards and battery backup units
Upgrade and Maintenance Manual
(if applicable)
125