Basic Hardware Procedures; Shutting Down The Server Node - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

4

Basic hardware procedures

4.1

Shutting down the server node

Safety notes
V
CAUTION!
For further safety information, please refer to chapter
information" on page
I
This step is only required when upgrading or replacing non-hot plug
components.
Ê Inform the system administrator that the server node will be shut down and
put offline.
Ê Terminate all applications.
Ê Press the On/Off button either on the rear or on the corresponding front
panel to shut down the server node.
I
If the system is running an ACPI-compliant operating system,
pressing the On / Off button will perform a graceful shutdown.
CX250 S2
31.
Upgrade and Maintenance Manual
"Important
45

Advertisement

Table of Contents
loading

Table of Contents