Installing A Memory Module; Concluding Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

7.2.3

Installing a memory module

Figure 94: Installing memory modules (A)
Ê Press out the securing clip at each end of the memory module connector.
Figure 95: Installing memory modules (B)
Ê Press down on the memory module until the securing clips snap into the
cutouts at each end of the module.
V
CAUTION!
Install dummy modules in not used memory slots.
7.2.4

Concluding steps

Perform the following procedures:
"Installing the memory slot air ducts" on page 61
Ê
Ê If a BBU is installed connect the BBU cable to the BBU connector on the
mezzanine SAS RAID controller described in section
boards" on page
"Routing the BBU cable" on page
CX250 S2
251,
figure 152
and route the cable as described in section
159.
Upgrade and Maintenance Manual
Main memory
"Connectors on the
177

Advertisement

Table of Contents
loading

Table of Contents