Ê Remove the mezzanine card bracket from the card as described in section
"Removing the mezzanine card bracket from the card" on page
6.4.3.4
Installing the mezzanine card
Ê Mount the mezzanine card bracket on the new mezzanine card as described
in section
"Mounting the mezzanine card bracket onto the card" on page
Ê Install the new mezzanine card as described in section
mezzanine card" on page
Ê If applicable, connect internal cables to the expansion card.
I
For a complete cabling overview, please refer to section
overview" on page
6.4.3.5
Concluding steps
Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê Reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Enabling boot watchdog functionality" on page 74
Ê
"After replacing / upgrading LAN controllers" on page 82
Ê
"Updating the NIC configuration file in a Linux environment" on page 77
Ê
"Looking up changed MAC / WWN addresses" on page 80
Ê
CX250 S2
Expansion cards and battery backup units
116.
246.
Upgrade and Maintenance Manual
53.
51.
"Installing the
"Cabling
(if applicable)
123