Usb Flash Module (Ufm); Installing The Ufm Board; Required Tools; Preliminary Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

System board and components
9.2

USB Flash Module (UFM)

The server node can be equipped with a USB Flash Module (UFM).
9.2.1

Installing the UFM board

Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
9.2.1.1

Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH1 / (+) No. 1 screw driver
9.2.1.2

Preliminary steps

Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Ê Locate the desired server with the ID button.
"Shutting down the server node" on page 45
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 46
Ê
214
Upgrade and Maintenance Manual
CX250 S2

Advertisement

Table of Contents
loading

Table of Contents