Concluding Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Figure 45: Installing the expansion card (B)
Ê Place the riser module onto the chassis (1).
Ê Secure the riser module with two screws (2).
Ê If applicable, connect internal cables to the expansion card.
I
For a complete cabling overview, please refer to section
overview" on page
6.3.1.5

Concluding steps

Perform the following procedures:
"Installing the mezzanine card bracket" on page 49
Ê
card) or
"Installing the mezzanine card" on page 116
card)
"Installing the server node in the server enclosure" on page 63
Ê
Ê Reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Updating RAID controller firmware" on page 73
Ê
CX250 S2
Expansion cards and battery backup units
246.
Upgrade and Maintenance Manual
"Cabling
(without the mezzanine
(with the mezzanine
(if applicable)
105

Advertisement

Table of Contents
loading

Table of Contents