Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual page 181

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Ê Connect the SATA cable(s) to the connectors on the system board described
in section
"Connectors on the boards" on page
the cables as described in section
page 143
or
"Cable routing with onboard controller" on page
"Installing the server node in the server enclosure" on page 63
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Updating or recovering the system board BIOS and BMC" on page 67
Ê
applicable)
"Enabling boot watchdog functionality" on page 74
Ê
"Verifying the memory mode" on page 75
Ê
CX250 S2
"Cabling with onboard controller" on
Upgrade and Maintenance Manual
251,
figure 150
(if applicable)
Main memory
and reroute
145.
(if
181

Advertisement

Table of Contents
loading

Table of Contents