Removing A Memory Module; Installing A Memory Module; Concluding Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

7.4.3

Removing a memory module

Ê Identify the defective memory slot.
Ê Remove the defective memory module as described in section
memory modules" on page
7.4.4

Installing a memory module

Ê Install the new memory module as described in section
modules" on page
7.4.5

Concluding steps

Perform the following procedures:
"Installing the memory slot air ducts" on page 61
Ê
Ê If a BBU is installed connect the BBU cable to the BBU connector on the
mezzanine SAS RAID controller described in section
boards" on page
"Routing the BBU cable" on page
Ê Connect the SATA cable(s) to the connectors on the system board described
in section
"Connectors on the boards" on page
the cables as described in section
page 143
or
"Cable routing with onboard controller" on page
"Installing the server node in the server enclosure" on page 63
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Updating or recovering the system board BIOS and BMC" on page 67
Ê
applicable)
"Enabling boot watchdog functionality" on page 74
Ê
"Verifying the memory mode" on page 75
Ê
CX250 S2
179.
176.
251,
figure 152
and route the cable as described in section
159.
Upgrade and Maintenance Manual
251,
"Cabling with onboard controller" on
(if applicable)
Main memory
"Removing
"Installing memory
"Connectors on the
figure 150
and reroute
145.
(if
183

Advertisement

Table of Contents
loading

Table of Contents