Transporting the server
Only transport the server in its original packaging or in packaging that
protects it from impacts and jolts.
For the Japanese market, transporting the device in its original packaging
does not apply.
Do not unpack the server until it is at its installation location.
If you need to lift or transport the server, ask other people to help you.
Because the PRIMERGY CX250 S2 is large and heavy, at least two people
are needed.
Never lift or carry the device by the handles on the front panel.
Notes on installing the server in the rack
For safety reasons, at least two people are required to install the server
in the rack because of its weight and size.
(For the Japanese market, please refer to " 安全上のご注意 ".)
Never lift the server into the rack using the handles on the front panel.
When connecting and disconnecting cables, observe the relevant
instructions in the "Important Information" chapter of the technical manual
for the corresponding rack. The technical manual is supplied with the
corresponding rack.
When installing the rack, make sure that the anti-tilt protection is correctly
fitted.
For safety reasons, no more than one unit may be removed from the rack at
any one time during installation and maintenance work.
If several units are simultaneously removed from the rack, there is a risk that
the rack could tip over.
The rack must be connected to the power supply by an authorized specialist
(electrician).
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the power
supply's fuse protection must comply with the requirements for non-
industrial power supply networks for the type A connector.
CX250 S2