Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual page 95

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Figure 37: Latching the locking bail
Ê Carefully fold up and latch the locking bail.
Figure 38: Attaching the protective optical port plug
Ê If the SFP+ transceiver module is not immediately connected to an LC
connector, attach the protective optical port plug to the transceiver optical
bores.
CX250 S2
Expansion cards and battery backup units
Upgrade and Maintenance Manual
95

Advertisement

Table of Contents
loading

Table of Contents