Expansion cards and battery backup units
6.2.2
Handling SFP+ transceiver modules
6.2.2.1
Installing SFP+ transceiver modules
Upgrade and Repair Units (URU)
Average task duration: 5 minutes
Required tools
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
●
Preparing the SFP+ transceiver module
Figure 34: Removing the protective optical port plug
Ê Remove the SFP+ transceiver module from its protective packaging.
Ê Remove the optical port plug from the new / additional SFP+ transceiver
module.
92
Upgrade and Maintenance Manual
CX250 S2