Concluding Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Processors
Figure 120: Heat sink types
1 Heat sink for CPU0
Ê Remove the protective cover from the heat sink.
I
Ensure not to touch the thermal paste on the bottom of the heat sink.
Ê Install the processor heat sink as described in section
processor heat sink" on page
8.3.5

Concluding steps

Perform the following steps:
"Installing the server node in the server enclosure" on page 63
Ê
"Updating or recovering the system board BIOS and BMC" on page 67
Ê
applicable)
"Switching on the server node" on page 64
Ê
"Enabling boot watchdog functionality" on page 74
Ê
208
201.
Upgrade and Maintenance Manual
2 Heat sink for CPU1
"Installing the
(if
CX250 S2

Advertisement

Table of Contents
loading

Table of Contents