Expansion cards and battery backup units
6.5.2
Removing the mezzanine SAS RAID controller
Upgrade and Repair Units (URU)
Average hardware task duration: 10 minutes
Average software task duration: 5 minutes
6.5.2.1
Required tools
Preliminary and concluding steps: tool-less
●
Main steps:
●
– Phillips PH2 / (+) No. 2 screw driver
6.5.2.2
Preliminary steps
Perform the following procedures:
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 45
Ê
Ê Remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 46
Ê
6.5.2.3
Removing the mezzanine SAS RAID controller
Ê Remove the mezzanine SAS RAID controller as described in section
"Removing the mezzanine card" on page
Ê Remove all SAS cables, see also
Ê If applicable, remove the BBU and the BBU cable.
Ê Remove the mezzanine card bracket from the card as described in section
"Removing the mezzanine card bracket from the card" on page
Ê Install the mezzanine card bracket as described in section
mezzanine card bracket" on page
142
"Connecting cables" on page
49.
Upgrade and Maintenance Manual
119.
"Installing the
139.
53.
CX250 S2