Concluding Steps; Replacing A Bbu; Required Tools; Preliminary Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Expansion cards and battery backup units
6.7.2.5

Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Updating RAID controller firmware" on page 73
Ê
"Enabling boot watchdog functionality" on page 74
Ê
6.7.3

Replacing a BBU

Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
V
CAUTION!
Do not throw battery backup units into the trash can. Batteries must be
disposed of in accordance with local regulations concerning special
waste.
For further information, please refer to chapter
page
31.
6.7.3.1

Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH1 / (+) No. 1 screw driver
6.7.3.2

Preliminary steps

Perform the following procedures:
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 45
Ê
166
Upgrade and Maintenance Manual
(if applicable)
"Important information" on
CX250 S2

Advertisement

Table of Contents
loading

Table of Contents