Completing The System Board - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

System board and components
Figure 145: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).
9.3.3.4

Completing the system board

"Installing the riser module" on page 59
Ê
"Installing the UFM board" on page 215
Ê
Ê Install all expansion cards as described in chapter
battery backup units" on page 83
I
Install the expansion cards into their original slots.
"Installing a memory module" on page 177
Ê
I
Install the memory modules into their original slots.
242
(if applicable)
Upgrade and Maintenance Manual
(if applicable)
"Expansion cards and
CX250 S2

Advertisement

Table of Contents
loading

Table of Contents