Figure 52: Installing the mezzanine card (B)
Ê Secure the mezzanine card with one screw (1).
Ê Secure the mezzanine card bracket with two screws (2).
Ê If applicable, connect internal cables to the expansion card.
I
For a complete cabling overview, please refer to section
overview" on page
6.4.1.5

Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê Reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Enabling boot watchdog functionality" on page 74
Ê
"After replacing / upgrading LAN controllers" on page 82
Ê
CX250 S2
Expansion cards and battery backup units