System board and components
9.2.1.4

Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Enabling boot watchdog functionality" on page 74
Ê
9.2.1.5

Software configuration

The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê Switch on the server.
Ê Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
Ê The server should now boot from the "Recovery Tool CD".
Ê Follow the on-screen instructions.
9.2.2

Removing the UFM board

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
9.2.2.1

Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH1 / (+) No. 1 screw driver
9.2.2.2

Preliminary steps

Perform the following procedures: