Next step
Applications
Field
Description
Δ
Height difference from the measured point to the stake out point.
Positive if the stake out point is higher than the measured point.
ΔLine
Longitudinal distance from the measured point to the stake out point.
Positive if stake out point is further away than the measured point.
ΔOffset
Perpendicular distance from the measured point to the stake out
point. Positive if stake out point is to the right of the measured point.
•
Either, press ALL to measure and record.
•
Or, press ESC to return to the DEFINE GRID screen and from there, press PREV
to return to the REFERENCE LINE - MAIN screen.
FlexLine, 129