Section 3. Operation; Controls And Indicators; Operating Procedure; Controller Interface - Ultrak CCU-100HD User Manual

Central control unit
Table of Contents

Advertisement

3.1

CONTROLS AND INDICATORS

The only control on the CCU is the power input selection on the rear panel. The
power input is selectable between 110 Vac and 220 Vac. The switch can be
changed between 110 and 220 using a small flat blade screwdriver. If the power
input is changed, ensure the correct fuse is installed. See Section 1, paragraph
1.3 of this manual for the fuse values.
The only indicator on the CCU is the power indicator on the front panel. When
power is applied to the unit, the power indicator lights green.
3.2

OPERATING PROCEDURE

The operation of the CCU depends on the type of interconnecting equipment
being used, the control data sent to the CCU for processing, and the
programming of the CCU by the user. One or more operators can manually
control the system using the JPD-100 Controllers, KBD-100A Keyboard, or SHB-
100 ShotBox Units. The CCU can be programmed to automatically control the
system by responding to alarm inputs and time.
3.2.1
JPD-100 Controller Interface
All operator control data entered at a JPD-100 Controller is sent to the CCU.
The CCU processes all control commands and sends data out the
appropriate channels to perform the requested actions.
control of a FastScan/SmartScan unit or receiver to the last operator or
MultiCall that requests control. The video switching control data is sent out
COM2 to the Ultrak video switcher, all FastScan/SmartScan and receiver
control data is sent out channels 4, 6, and COM2. Auxiliary Control data for

SECTION 3. OPERATION

3-1
The CCU gives

Advertisement

Table of Contents
loading

Table of Contents