Running A Performance Validation Test - Loma IQ2 User Manual

Hide thumbs Also See for IQ2:
Table of Contents

Advertisement

78
Using Performance
Validation
To specify the false threshold
• Press
This is used to identify metal test
samples or other metal objects that
give a greater signal value than those
specified for testing. If the signal
exceeds the set false threshold value
the message False contaminant will
be displayed and the pass count will
not be incremented.
V
to display the False
e
thresh option and press
it.

Running a performance validation test

If timing has been set to INTERVAL or BATCH in the PV Test Setup menu a Performance
Validation test will automatically be initiated during normal product testing. A PV test is
automatically initiated in the following situations:
• If timing has been set to Interval in the PV Test Setup menu and the specified time
interval has lapsed.
• If the Batch, Interval, Time, or Size has been exceeded, depending on how the batch
reporting has been setup.
• If a batch is manually reset.
• If the product is recalibrated.
• If a batch is terminated or a new batch is started as a result of changing the current
product.
When this happens the normal operating display will show:
Run PV test
e
• Press
to proceed with the PV test.
Alternatively, a Performance Validation test can be run at any time from the Results menu
using the following procedure.
*False thresh
to edit
It can be set to any value between 0 and
99990, and can be adjusted in steps of ten
units. It defaults to twice the normal
threshold value.
?
2000
8024

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents