Loma IQ2 User Manual page 111

Hide thumbs Also See for IQ2:
Table of Contents

Advertisement

94
Installing the metal
detector
• Refer to the previous illustration for connector block wiring details. Make the connections
to the connector block as follows:
AC wiring colours will vary according to territory.
North America
UL approved models
120V
All Others
200/240V
Relay contact information
If your metal detector is supplied with a reject device or any peripherals they will already be
connected.
However if you are connecting your own reject device refer to the voltage free relay
connection information given below. It is suggested that the reject device wiring is
connected in series with a set of fault relay contacts to enable the reject to be operated in
the event of a system fault being generated, ensuring failsafe reject operation for a fault
condition. Contact switching information is given in About the metal detector range, page 1.
Connections are made depending upon your requirement. Contacts shown are for relays
when de-energized (failsafe):
Pin1
Reject relay 2 contact sets
NC C NO NC C NO
• Check that all connections are secure and correct then securely refit the terminal access
plate to the power supply cover.
• Close and secure the control box door.
Black
=
White
=
Green/Yellow
=
Brown
=
Blue
=
Green/Yellow
=
Fault relay 2 contact sets
Error relay
Run relay
NC C NO NC C NO
NC C NO NC C NO
HOT
NEUTRAL
EARTH
LIVE
NEUTRAL
EARTH
9094

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents