Loma IQ2 User Manual page 93

Hide thumbs Also See for IQ2:
Table of Contents

Advertisement

76
Using Performance
Validation
To set the performance validation
interval
• Press
• Press
• Press
(Continued)
V
to display the Synch
e
option and press
to edit it.
^
V
or
to increase or
decrease the synch time respectively
e
and press
to confirm it.
V
to display the Test
window option and press
edit it.
This specifies the time in minutes
within in which the PV test must be
completed. If not completed within
the specified time a PV test timeout
error is reported.
*Synch
Set Synch to 00.00 for unsynchronized
testing. For example, if the Interval is set to
six hours each PV test will be initiated six
hours after the completion of the previous
one.
Set Synch to the time of day for
synchronized timing. For example, if Interval
is set to six hours and Synch is set to 14.30,
a PV test will be initiated at 2.30pm and then
subsequently every six hours, irrespective of
how long the PV test takes to complete.
*Test window
e
to
14.30
30
8024

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents