Setting Up Pv Testing - Loma IQ2 User Manual

Hide thumbs Also See for IQ2:
Table of Contents

Advertisement

Setting up PV testing

To use PV testing the PV Test option must be set to YES in the User Options menu. An
additional PV test setup option will then appear when defining a new product:
PV test setup
e
• Press
to select it.
A series of options then allow you to specify how the performance validation test operates,
and these are described in the following sections.
NOTE: PV test setup is not available with Reverse mode detection.
To set the performance validation
interval
• Select the PV test setup menu as
described above.
The timing option will be displayed:
e
• Press
to edit it.
^
V
• Press
or
the options OFF, INTERVAL, or
BATCH, and press
If you have selected INTERVAL:
V
to display the Interval
• Press
option and press
^
• Press
and
decrease the interval in hours and
minutes and press
8024
to select between
e
to confirm it.
e
to edit it.
V
to increase or
e
to confirm it.
*Timing
INTERVAL
BATCH is only available if Batch reports
has been set to YES in the Report options
menu.
Interval
The maximum time is 24 hours and the
minimum time is the Test window value plus
one minute. For example, to perform a PV
test every six hours set Interval to 6.00.
} 06.00
75
Using Performance
Validation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents