Running A Performance Validation Test - Loma IQ3X Operating Instructions Manual

Metal detection system
Table of Contents

Advertisement

77

4.25 Running a Performance Validation Test

To run a PV test, proceed as follows:
1. To manually run a PV test, select Menus > Run PV Test to display the Run PV Test ? menu and
press the OK / Enter Key to confirm that you want to run the test.
Where PV testing is being automatically initiated the Run PV Test ? menu is automatically
displayed.
2. The Operator id option will be displayed. Press the OK / Enter Key to select the field for editing
and then enter your Operator ID.
3. The test will advise you of the type and size of the first test wand to be used, previously
specified in the PV Test Set Up menu.
Note that if no test sample sizes have been programmed then the display will show
+No Samples+ and a report will be produced immediately.
4. You will then be prompted to pass test sample packs through the detector until the FE test is
complete.
5. Follow the prompts to repeat steps 3 and 4 for the NFE and SS tests until the test is complete.
To cancel a PV test, proceed as follows:
1. To cancel the PV test, just press the Cancel Key at any time to return to the Run PV Test ?
menu.
If the test was initiated manually, no error is generated.
If the test was initiated automatically, a non-action error is recorded and a report is generated.
Original Document
Operating Instructions
Copyright © Loma Systems

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents