Installing the metal
detector
WARNING: For continued protection against the risk of fire replace only with the same type
and rating of fuse.
Access to the fuses can be gained as follows:
• Using the 5mm allen key supplied with your equipment, unscrew the two front hinged
door screws on the control box and open the door.
• Undo and remove the four M3 pillars securing the PSU safety mesh screen cover and
carefully remove.
The cover is connected via a ground wire to the control box; there is no requirement to
remove this connection. The wire is of sufficient length to allow the placing of the cover in the
bottom of the hinge door.
All three fuses are situated in the bottom left-hand corners of the main control board. Once
replaced assembly is the reverse of the above.
Installing a serial link
The main control electronics board must have the optional Report/Logs package and serial link
board fitted.
In order to use any of the serial link options your detector will require a cable and connector
assembly which facilitates external connection to the on board serial link electronics. The
connector is normally located on the underside of the control box.
If a serial link option was ordered with your detector the necessary internal cables and external
socket complete with a blank mating external plug and connection diagrams will be supplied.
If you wish to add a serial link to an existing system please contact your local Service Centre
who will be pleased to assist.
Refer to your optional Service Manual for wiring installation guidelines and link position
information for all available links.