Running A Performance Validation Test - Loma IQ3 User Manual

Table of Contents

Advertisement

Running a Performance Validation Test

To run a PV test, proceed as follows:
1.
To manually run a PV test, select Menus
> Run PV Test to display the Run PV
Test ? menu and press the OK / Enter
Key to confirm that you want to run the
test.
Where PV testing is being automatically
initiated the Run PV Test ? menu is
automatically displayed.
The Operator id option will be displayed.
Press the OK / Enter Key to select the
2.
field for editing and then enter your
Operator ID.
The test will advise you of the type and
size of the first test wand to be used,
3.
previously specified in the PV Test Set
Up menu.
Note that if no test sample sizes have been programmed then the display will show +No
Samples+ and a report will be produced immediately.
You will then be prompted to pass test
4.
sample packs through the detector until
the FE test is complete.
5.
Follow the prompts to repeat steps 3 and 4 for the NFE and SS tests until the test is complete.
To cancel a PV test, proceed as follows:
1.
To cancel the PV test, just press the
Cancel Key at any time to return to the
Run PV Test ? menu.
If the test was initiated manually, no error
is generated.
If the test was initiated automatically, a
non-action error is recorded and a report
is generated.
Operating Instructions
105

Advertisement

Table of Contents
loading

Table of Contents