Reloading Modules; Reloading The Switch; Power Cycling Modules - Cisco Nexus 7000 Hardware Installation And Reference Manual

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Appendix 8
Managing the Switch Hardware
Power Usage Summary:
--------------------
Power Supply redundancy mode (configured)
Power Supply redundancy mode (operational)
Total Power Capacity (based on configured mode)
Total Power of all Inputs (cumulative)
Total Power Output (actual draw)
Total Power Allocated (budget)
Total Power Available for additional modules
switch#

Reloading Modules

You can reload the entire switch, reset specific modules in the switch, or reload the image on specific
modules in the switch.
This section includes the following topics:

Reloading the Switch

To reload the switch, use the reload command without any options. When you use this command, you
reboot the switch.
If you need to use the reload command, be sure to save the running configuration by using the copy
Note
running-config startup-config command beforehand.

Power Cycling Modules

To power cycle any module, follow these steps:
Identify the module that needs to be reset.
Step 1
Reset the identified module by entering the reload module command. This command power cycles the
Step 2
selected module.
switch# reload module number
The number indicates the slot in which the identified module resides.
Caution
OL-23069-06
Reloading the Switch, page 8-29
Power Cycling Modules, page 8-29
Reloading a module disrupts traffic through the module.
Redundant
Redundant
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
Reloading Modules
9000 W
18000 W
2259 W
4750 W
4250 W
8-29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents