Installing The Cable Management Frame - Cisco Nexus 7000 Hardware Installation And Reference Manual

7000 series
Hide thumbs Also See for Nexus 7000:
Table of Contents

Advertisement

Chapter 5
Installing a Cisco Nexus 7018 Chassis

Installing the Cable Management Frame

Figure 5-7
ESD Grounding Ports on the Front of the Cisco Nexus 7018 Chassis
1
ESD grounding port
Installing the Cable Management Frame
After you have fully installed the Cisco Nexus 7018 switch chassis in the rack or cabinet (see the
"Installing the Chassis" section on page
5-7), you can install the cable management frame on the front
of the chassis.
When you install the cable management frame, you attach four cable management assemblies to the
chassis and then attach a top hood to the top two cable management assemblies and the chassis.
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
5-16
OL-23069-07